The pipe across the paddock has become increasingly damaged with age and vehicle traffic, also it would consistently get blocked where the 20mm pipe joins the 15mm pipe.  This project took 20mm pipe from the dam around the trees and up to the water tank.

The new water pipe, overflow pipe now go through the eave

Pipes have been buried in areas of high traffic

With minimal water flow in the creek we still where getting water