The wet back was blown out in the freeze of 2006

This was replaced with a different chip heater. A drainage tap has been added to the bottom to enable winter draining

Two pipes got blown out in the solar panel

The layout and pipe structure have been improved to increase effeciency

The snow created havoc in the forest with many trees broken

All of the trees aroound the hut and in the clearing areas were removed and cut for firewood where appropriate

Three pipes at the back of the shower including the shower head where blown out

I new head was installed which also allows for winter draining

The filter in the dam was replaced with a new design which will provide greater reliability with water flow