Odd jobs that have been completed at different times

Open fire place was removed from front of hut

Thebroken window was replaced

The frame was strengthed

Taps were secured to the wall

A shower was installed

Bunks were strengthened

All the junk was removed from the shed and more junk added

Movable vent added to louvres

Holes closed off

Ceiling repaired

Solar panel installed

Trees cleared from the outside fire for safety

A filter installed at the dam to stop water pipe clogging

Leak fixed in roof and other chimney used as vent